Harvest Fresh Produce Packing Line

Auction starts: February 3, 2020 at 01:00 PM PST , Closing begins: February 26, 2020 at 12:00 PM PST
Othello, WA
Auction Type: Online

Items

Sideshift, LPG, 7804 HR Meter Reads - s/n 31636

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Sideshift, LPG, 4677 HR Meter Reads - s/n 11282

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Battery Type E0, 36 Volts, 6243 HR Meter Reads - s/n TMX250-2365-9803KF

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
LPG, 2271 HR Meter Reads - s/n E010V02388E

Removal: Phase 1 - February 27-28 and March 2-6, 2020
-s/n D001H05325W

Removal: Phase 1 - February 27-28 and March 2-6, 2020
LPG, 7790 HR Meter Reads - s/n A177B16547C w/ Malavac Rotating Bin Dump

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Dayton 1/2 Motor, 3 Phase

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor 1 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor 1.5 Hp Motor on M7

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor 1.5 Hp Motor on M5

Removal: Phase 1 - February 27-28 and March 2-6, 2020
2 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
60 HZ Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor 1.5 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
1.5 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020


 
1/2 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 3 - March 16-20, 2020
Baldor 5 Hp Motor

Removal: Phase 3 - March 16-20, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020

 
2 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
3.5 Hp Motor, Culls

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Baldor Motor
Wash Area

Removal: Phase 3 - March 16-20, 2020
 
Baldor 3Hp Motor
Wash Area

Removal: Phase 3 - March 16-20, 2020
E-7 26' 4" x 4' 1 1/4" Transfer Conveyor - Dayton 3 Hp Motor Including Custom Catwalk F-1 40' 9" x 1' 7 1/2" Transfer Conveyor - Baldor 2 Hp Motor E-8 24' x 4' 4 1/2" Transfer Conveyor - Motor w/ Sorting Discard Buckets for Dirt, Rocks and Culls F-4 12' 3" x 4' 4 1/4" Roller Conveyor - Motor F-2 40' 8 3/4" x 1' 7 1/2" Transfer Conveyor - Motor I-3 40' 10" x 1' 11" Discard Bin with Conveyor - Motor , 13' 2" x 2' 5" Conveyor I-4

Removal: Phase 3 - March 16-20, 2020
4 Motors

Removal: Phase 3 - March 16-20, 2020
Baldor 1.5 Hp Motor

Removal: Phase 3 - March 16-20, 2020
Motor

Removal: Phase 3 - March 16-20, 2020
Motor

Removal: Phase 3 - March 16-20, 2020
18 1/8" Diameter Wheel, US Motors 7.5 Hp Motor

Removal: Phase 3 - March 16-20, 2020
Baldor 2 Hp Motor

Removal: Phase 3 - March 16-20, 2020
Baldor 1.5 Hp Motor

Removal: Phase 3 - March 16-20, 2020
Motor

Removal: Phase 3 - March 16-20, 2020
Reliance 1 Hp Motor

Removal: Phase 3 - March 16-20, 2020
Divider Motor

Removal: Phase 3 - March 16-20, 2020
Divider Motor

Removal: Phase 3 - March 16-20, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020

 
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Reliance 1 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Monitor and Keyboards with updated software in 2019

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Monitor and Keyboards with updated software in 2019

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor 10 Hp Engine, Ironman Gearbox, Includes Catwalk

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor 5 Hp Engine, Ironman Gearbox, Includes Catwalk

Removal: Phase 1 - February 27-28 and March 2-6, 2020
2 Motors, 8 Row Box Filler, Catwalk

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor 1.5 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
10.3'x9.9' Platform
8'x7.8' Enclosed Office

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor 5 Hp

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
s/n 600-24T

Removal: Phase 1 - February 27-28 and March 2-6, 2020
s/n 650-97T

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Baldor Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
1.5 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
s/n CE-64

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Boston 3/4 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
2 Sections
Sprinkler Set up

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
240 Volts, 3 Phase, 10 H.P. - s/n 59098

Removal: Phase 1 - February 27-28 and March 2-6, 2020
Motor

Removal: Phase 3 - March 16-20, 2020
1.5 Hp Motor

Removal: Phase 3 - March 16-20, 2020
Motor

Removal: Phase 3 - March 16-20, 2020
7.5 Hp Motor, 18' 1/8" Diameter

Removal: Phase 3 - March 16-20, 2020
2 Hp Motor

Removal: Phase 3 - March 16-20, 2020
2 HP Motor

Removal: Phase 3 - March 16-20, 2020
1.5 Hp Motor

Removal: Phase 3 - March 16-20, 2020
1.5 Hp Motor

Removal: Phase 3 - March 16-20, 2020
3 Hp Motor

Removal: Phase 3 - March 16-20, 2020
3 Hp Motor

Removal: Phase 3 - March 16-20, 2020
3 Hp Motor

Removal: Phase 3 - March 16-20, 2020
3 Hp Motor

Removal: Phase 3 - March 16-20, 2020
s/n 14325, 18" Belt

Removal: Phase 2 - March 10-14. 2020
s/n L93 w/ 15' 1/2"x20" Spinks Scale Model A - s/n 37314

Removal: Phase 2 - March 10-14. 2020
1 Hp Motor

Removal: Phase 2 - March 10-14. 2020
Baldor 1.5 HP, E4

Removal: Phase 2 - March 10-14. 2020
Motor

Removal: Phase 2 - March 10-14. 2020
s/n D15220180 - s/n 95-065, Kwik Lok 865 Bag Closers and 874 Printers, Busch RA0063F Vacuum Pump, Large Weighing Buckets, One Bagger Not Operable

Removal: Phase 2 - March 10-14. 2020
Removal: Phase 2 - March 10-14. 2020
Electric Motor

Removal: Phase 2 - March 10-14. 2020
1.5 Hp Motor

Removal: Phase 2 - March 10-14. 2020
1Hp Motor, Includes Catwalk

Removal: Phase 2 - March 10-14. 2020
Baldor Reliance 2 Hp Motor

Removal: Phase 3 - March 16-20, 2020

 
2 Hp Motor

Removal: Phase 3 - March 16-20, 2020
s/n 204082 w/ Busch Bagger Vacuum and 16" VMC03709003 Conveyor - s/n 091003, Kwik Lok 865 Bag Closers and 874 Printers, Gooseneck Feed Elevator w/ 2 Conveyors

Removal: Phase 2 - March 10-14. 2020
Removal: Phase 2 - March 10-14. 2020
19" Belt, 20 Amp, 3 Phase - s/n 07110307

Removal: Phase 2 - March 10-14. 2020
s/n 207-248 with 2007 Nordson ProBlue 4 Glue Machine, 12" Conveyor Belt

Removal: Phase 2 - March 10-14. 2020
Fischbein Model 100 Bag Closer - s/n PBI151

Removal: Phase 2 - March 10-14. 2020
Graphic Operation Terminal GOT1000, (2) Kwik Lok 865 Closers 874 Printers - s/n E52385-1996, s/n 54686 1997 Newtec Ag Pak 14' x 4' 1/2" Incline Fluted In Feed Elevator, Upgraded Wicket Assemply to AP 7000 in 2018

Removal: Phase 2 - March 10-14. 2020
Dayton 1/2 Hp Motor

Removal: Phase 2 - March 10-14. 2020
Kwik Lok 865 Bag Closer with 874 Printer - s/n 5242-1996, Incline Elevator

Removal: Phase 2 - March 10-14. 2020
Baldor 1 Hp,Nordson Pro Blue 4 Glue with 13'x16" Incline V Belt Conveyor

Removal: Phase 2 - March 10-14. 2020
Baldor 1.5 Hp Motor, Culls

Removal: Phase 3 - March 16-20, 2020
Baldor Motor, Culls

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020

Culls
Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Baldor 2 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Motor

Removal: Phase 3 - March 16-20, 2020
3 Hp Motor, Culls

Removal: Phase 3 - March 16-20, 2020
3 Hp Motor, Culls

Removal: Phase 3 - March 16-20, 2020
 
Motor, Culls

Removal: Phase 3 - March 16-20, 2020
1.5 Hp Motor

Removal: Phase 3 - March 16-20, 2020
2 Hp Motor, Culls

Removal: Phase 3 - March 16-20, 2020
1.5 HP Motor, Culls

Removal: Phase 3 - March 16-20, 2020
2 Hp Motor, Culls

Removal: Phase 3 - March 16-20, 2020
2 HP Motor, Culls

Removal: Phase 3 - March 16-20, 2020
Motor

Removal: Phase 3 - March 16-20, 2020
Motor

Removal: Phase 3 - March 16-20, 2020
Baldor 1 Hp Motor

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Industrial Ventilation Control Box

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
-s/n ABF1693DF

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
- s/n 1881

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
-s/n 1898

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
230V, 1 Phase

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
-s/n J03M545005

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
-s/n LE196319, Miller Migmatic M-25 Welding Gun, Welding Helmets
Note: Does Note Include Norco Tank photoed

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
- s/n A1163733

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Note: Tanks Not Included
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Includes Contents

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Includes, Nuts, Bolts, Washers

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
- s/n 8050029

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
2 Shelves

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Includes Contents

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Serviced Mid January 2020

Removal: Phase 1 - February 27-28 and March 2-6, 2020


 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Shurflo 5059, Spray Gun w/ Hose Reel, 24V Spray Pump

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
8'x8'x8', Sliding Door, Electrical Lights, 3 Sides

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
4'x2.5'x4', Front Door, 3 Sides

Removal: Phase 1 - February 27-28 and March 2-6, 2020
 
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020
Removal: Phase 1 - February 27-28 and March 2-6, 2020

Copyright © Proxibid Inc. t/a Wavebid 2024